PURA and United Illuminating to Review New EV Charging Incentives with Club

Post by Barry Kresch

All are welcome to our virtual meeting on January 25th at 7 PM to hear and ask questions about the new incentive program for EV charging to be offered by the EDCs (utilities, or electricity distribution companies).

With us that evening will be Stefanie Keohane of the Public Utilities Regulatory Authority (PURA), which initiated this program as part of its grid modernization efforts, along with Charles Spence and Marriott Dowden of United Illuminating. Charles and Marriott are the consumer-facing individuals for the residential and commercial aspects of the program respectively.

Two recent blog posts discussed the single family and multi-unit residential parts of the program. There are also incentives targeted to workplace, commercial, and fleets, encompassing both level 2 and level 3 charging. Incentives include subsidies for charging hardware, installation (including make ready), and electricity costs (including demand charge mitigation).

This is a statewide program. Even though our speakers are from United Illuminating, Eversource customers have access to the identical program.

This meeting is being recorded and will be uploaded to the club YouTube channel.

The meeting is free but registration is required: https://us02web.zoom.us/meeting/register/tZYrcuutrzguGdd3O4Z_k9pqFUXrxPwSBK1b




Single Family Residential Charging Incentives

Post by Barry Kresch

Charging Incentives Via The Utilities

The incentives drafted by the Public Utilities Regulatory Authority that will be made available through Eversource and United Illuminating (commonly referred to as utilities, but in regulatory parlance known as EDCs or electric distribution companies) have been mostly finalized. There are a number of parts to them and we will be writing about them periodically over the next few weeks. There are subsidies for residential, commercial, municipal, and fleets. The residential charging program includes incentives for multi-unit dwellings (MUD) as well as single family. Incentives include subsidized charging stations, installation, make-ready, discounts on electricity, and demand charge mitigation.

The grid at the top and the explanation below cover the incentives for single family residences, which became effective on January 1, 2022.

The incentives for charging stations require the purchase of utility approved hardware. Incentives are not retroactive. The list of approved chargers will be published on January 20, 2022. Approved chargers will be smart chargers. Taking the subsidy requires enrollment in the demand-response charging program.

Residential Single Family Incentives

  • Up to a $500 incentive for purchase of a level 2 smart charging station. Smart = WiFi connected at a minimum of 25 MBPS or cellular service, 4G minimum.
  • Up to a $500 incentive to bring a 240 volt line to the garage, if needed.
  • Owners give the utility permission to see charging data.
  • Up to $200 per year for participating in demand-response charging events. Two year commitment required.

It is possible to get charging incentives for a non-networked (i.e. dumb) charging station that may have been previously installed or even for one that is bought new. In this case the charging information can be obtained either via vehicle telematics (if the vehicle has that capability), or the utility can send a device that will enable a dumb charger to access WiFi. There will be no charge for this device. The EDCs will be publishing a list of which vehicles qualify for telematics.

A $100 enrollment incentive is offered to people who participate using either telematics or a charger upgrade device.

  • An owner buying a new dumb charger is not eligible for the hardware subsidy, but is eligible for the installation subsidy.

The managed charging program in year one is limited to a demand response program. EV owners can get up to $200 per year ($50/month over 4 months) for their participation, whether that participation comes via a smart charger, telematics, or upgraded dumb charger. The demand response program is in effect from June 1 through September 30. During high demand periods, the utilities are permitted to reduce the rate of charge going to your vehicle. The vehicle will charge at roughly the rate of a level 1 charger during these periods. Typically, an event will last up to 3 hours and occur between 3:00 – 9:00 PM. There can be up to 15 events per month. Customers will be notified in advance of these events and be permitted to opt-out. If a customer opts out of 2 or fewer events and is plugged in at least once per month, they still qualify for the $50 monthly incentive. A 2-year commitment is required. Event notifications are to be communicated via smartphone app, web portal, email, or text message, usually the day before the event, but sometimes the day of the event. If you are not home and therefore not plugged in during an event, and have not opted-out, that counts as participation.

The demand-response incentives will be paid off-bill after the end of September.

There is no incentive for those who trickle-charge (level 1).

If a home does not have enough space in its panel to accommodate an EV charger and wishes to upgrade electric service, that is out of scope of the program. Service upgrades can run $5000 or more. Before doing that, it may pay to find out how much room you have or whether you can share a circuit. Perhaps you can install a lower-powered unit than you originally planned.

An Advanced Managed Charging program will be offered beginning in 2023. Details have not yet been finalized.

If someone uses the hardware and installation incentives, but then does not allow the demand-response throttling, and therefore will not collect any of the $200 incentive, it is not known if the EDC will try to claw back the hardware and installation incentives.

Note: Eversource is maintaining its Connected Solutions branding and migrating existing customers into the new program.

We are planning a virtual meeting for January 25th at 7:00 PM, which will include speakers from PURA and UI.

This is the Eversource splash page with links to apply for the incentives. This is the UI page. There is still being work done on the back end and the application portals will be open by the end of Q1 2022.

Incentives available to Eversource and UI customers only.




Chargers at DOT Open to Public

Chargers for DOT and Public

Those driving by the CT Department of Transportation campus in Newington may have noticed a bank of chargers looking like the one in the picture at the top of the post (thank you to Paul Braren for the photo).

There are chargers in front of the headquarters building. These will be open to DOT employees, visitors, and the public. There are other chargers in the visitors parking lot (https://www.plugshare.com/location/354128) and in the motor pool lot for state fleet vehicles.

These chargers are manufactured by Enfield, CT company EVSE, LLC. As you can see from the photo, they have a retractable cable, a nice feature which helps avoid the damage that can happen to chargers where the cable is manually wrapped, but in practice is often left on the ground, susceptible to damage.

EVs in the state fleet and EV chargers is the kind of holiday gift we want to receive. The chargers will be turned on by the beginning of January.




Jennifer Granholm Visits CT to Promote EVs, Infrastructure and Jobs

Publicity Event Held at EVSE, LLC, a Manufacturer of Commercial Grade EV Charging Equipment

Department of Energy Secretary Jennifer Granholm made two appearances in CT on December 2nd to promote the job-creation and clean energy aspects of the recently passed Infrastructure bill. This first stop in Enfield, where the photo was taken, consisted of a tour of the EVSE factory followed by a press conference. The Secretary also dropped a few words about the EV purchase-incentive provisions and another $6 billion of grant-based EV infrastructure funding for communities contained in the pending Build Back Better legislation. This is part of  a 2-day swing through New England.

The community grants are targeted for people who don’t live in single family homes or otherwise lack access to charging. The EV purchase incentives were described as “point of purchase,” which would be a change from the current tax credit, along with an incentive for used EVs. The Secretary said, “When the president sees stories about climate change, he thinks jobs. He wants to create supply chains here. He wants made in America, used in America, and exported elsewhere.”

A nifty short video was produced by her team about her stops in New Hampshire and Maine. https://youtu.be/tenGvHJZrKw

 




Looking Back, Moving Forward

Looking in the Rearview Camera Back Over a Busy 2021

As the year winds to a close, we take this opportunity to give our sincere thanks to all who have joined us for our meetings, events, advocacy, and information efforts. We look forward to seeing you in 2022!

Legislation

2021 was a disappointing year for climate legislation with our top priorities of direct sales, TCI, and adoption of the California emission standards for medium and heavy-duty vehicles not making it through the legislature.

The EV Club worked with the other members of the CT EV Coalition on these efforts but the Club was the tip of the spear on direct sales. We wrote blog posts and op-eds such as here (Hartford Courant)and here (CT Mirror). We called, emailed and met with legislators and gave testimony in support of SB 127, a bill we call EV Freedom. Our social media team did an outstanding job promoting direct sales and debunking bad PR meant to sow confusion and doubt about direct sales. Club member Will Cross – also Communications Director for Tesla Owners Club of Connecticut – built a platform, evfreedomct.com, to educate and inform the public about the bill, allow readers to show support by signing a petition and using social media to reach legislators and share excellent EV footage debunking many of the myths being advanced about direct sales.

The EV Freedom Bill made it out of the Transportation Committee but did not get called for a vote in the Senate. We were told that we were 1 vote shy. The bill will be reintroduced by Senator Haskell in 2022.

We held a well-attended press conference, as seen in these photos, with state officials, environmental organizations, labor, and others speaking.

Crowd at SB 127 Press ConferenceBarry Kresch, EV Club President, Speaking at SB 127 Press ConferenceSenator Haskell, Senator DuffModel Y and Lucid Air

We had support from Tesla and Lucid and were graced by the presence of a Model Y and the Lucid Air. Also, Rivian brought a pre-production R1T to Hartford and gave rides to legislators, followed by a small reception for club-members in New Haven. This was the vehicle’s first appearance in the state.EV Club CT and Rivian R1T

 

We thank the bill sponsors, Senator Haskell and Representative Steinberg, our friends at the CT Tesla Owners Club, and all of our members and others who reached out to their representatives, wrote an op-ed, or gave testimony before the legislature.

The only way this bill will pass is if constituents keep the pressure on. 2022 is an election year and it is the time to make our voices heard. We will be asking everyone to reach out again. Each year starts anew. If you have contacted your representatives in the past, memory is fleeting; it is important to do so again. Our state’s ability to meet its EV and emission reduction goals depends on it, not to mention that it has overwhelming consumer support. We will be communicating more specifics about the policy agenda for 2022 as they become available.

The footprint of the club continues to expand. We have now become a go-to source for press when comments about EV-related news are sought, including a recent, not as yet published article from CNN.com. The EV Club has also been invited to sit on the policy committee of the (national) Electric Vehicle Association (formerly the Electric Auto Association) even though we are not a chapter. The EVA formally endorses direct sales and will be another resource for us.

Events

  • The EV Club again partnered with Sustainable Fairfield to stage an EV Parade from Westport to Fairfield for National Drive Electric Week (NDEW). This year it was followed by an EV showcase at the parade terminus with speakers. Cars parked before the EV parade - EV C;lub CT
  • We supported as best we could other NDEW events held around the state, such as a successful event at Central Connecticut State University in New Britain.
  • We were pleased to again support the Electric Car Guest Drive folks at their ride and drive event in Montgomery, NY.

Speaking Engagements

  • AIACT – All electric home and BEVs webinar for architects
  • Sustainable Essex – Deep dive into EV charging
  • Route 7 EV Corridor dedication

Barry Kresch from EV Club of CT and other speakers at ribbon cutting for Route 7 EV Corridor designation

  • Municipal Police EV Adoption Workshop
  • West Hartford Environment Committee
  • Sustainable Weston
  • Sierra Club Hartford
  • Save the Sound Legislative Panel
  • Webinar (Please subscribe to our YouTube Channel!) – How to Save on an EV and Get Free Charging

(We will be updating our incentive content. There is a lot of news on the near-term horizon with the PURA/utility incentives about to be finalized, and the possibility of major changes to the federal purchase incentive in the Build Back Better bill.)

Data

  • Two updates to the EV Dashboard with more charts added.
  • Track of CHEAPR performance, which continues to under-perform (that means allocated funds are underspent)
  • Financial Analysis of Westport Police Model 3 patrol car, along with modeling out the financial implications for fleet adoption.

Select Meeting Speakers

  • Marissa Gillett, Chair of Public Utilities Regulatory Authority, spoke about the upcoming EV Rate Design.
  • Congressman Himes – A look forward to climate legislation
  • Citizens Climate Lobby – Dr. Roger Kuhns discussed a proposal for a carbon tax with dividend.
  • Stephen Wagner of South Windsor Planning and Zoning discussed using zoning regulations to improve charging access
  • Kim Pacquette, early Tesla FSD beta tester spoke early in the year, followed by a recent panel of local drivers who have the received the recent upgrade

Westport Fire Department

EV Club Members loaned their vehicles for training so first responders can learn how to handle the cables and where to cut if necessary. We have had another request, this one from the Bethel Fire Department. We are waiting on a firm date before asking for volunteers. All that is involved is leaving the vehicle for a few hours so they can look at the wiring.

Firefighters observing the wiring on a Tesla Model 3

Club members participated in a fund-raiser to help Louisiana residents after the hurricanes. It was a grassroots effort driven by Tesla owners and coordinated with local LA resident, Clean Technica journalist, Johnna Crider.

Finally, this post is being composed on giving Tuesday, though it most likely will not make it live until Wednesday (yep, that’s what happened). The EV Club does not take donations, but several of our esteemed partners on the EV Coalition would be happy for any largess, for example, Save the Sound, The Sierra Club, Acadia Center, League of Conservation Voters, Electric Vehicle Association. If you are considering further giving options this year, please consider them.

Please scroll to the bottom of the home page to fill out the form to join the club (free) and sign up for our email blasts inviting you to our virtual meetings and events.




Cutting the Cord – Westport Fire Department EV Training

Maintaining Safety for First Responders to an Accident Involving Electric Vehicles

EVs at fire department for trainingThis kind of cord-cutting risks a lot more than losing ESPN.

The Westport Fire Department is conducting staff training on dealing with EVs in an accident, for example, if there is severe damage, if occupants need to be cut out of the car, or if there is a potential for “thermal runaway” (battery igniting). First responders need to know how to safely handle the battery cables, and if necessary, where to cut.

EV Club owners and local dealers loaned their vehicles to the Westport Fire Department for training sessions being conducted this week and next. In this photo, there is a Chevy Volt, Toyota Prius Prime, and Honda Clarity, all of them plug-in hybrids. Other training sessions have battery electric vehicles, including a Jaguar iPace and Tesla Model 3.

The photo at the top of the post, from left to right, is of Brett Kirby, Assistant Chief of the Westport Fire Department, EV Club President Barry Kresch, and Jason Emery, an outside trainer brought in specifically for EV training.

These photos are of the trainer and fire department personnel observing the wiring of a Tesla Model 3.

Opening Up the Tesla Model 3 wiring compartmentTesla Model 3 wiringJason Emery explaining a Tesla Model 3Firefighters observing the wiring on a Tesla Model 3




Route 7 EV Corridor Designation

Route 7 is now an EV Corridor as officially designated by the U.S. Department of Transportation Federal Highway Administration (FHWA). These alternative fuel corridor (electric is only one of them) designations are intended to raise awareness among current EV owners and the public at large of the access to nearby charging. This is part of a strategy to promote interstate cooperation and a national build out of charging corridors. All corridor designations have to be re-certified every 5 years. This designation currently applies to the section of Route 7 from the I-95 interchange to New Milford.

Along with the designation, the ceremony held at Fodor Farm in Norwalk also acknowledged the donation of a level 2 charging station by JuiceBar, a Connecticut manufacturer (based in Norwalk) of EVSE.

The presenters were (left to right):

Tammy Thornton, Wilton Go Green

Barry Kresch, President, EV Club of CT

Senator Bob Duff (Majority Leader)

Carlo Leone, CT Department of Transportation

Mayor Rilling of Norwalk

Daphne Dixon, President of Live Green CT

First Selectman Dunn of Brookfield

First Selectman Marpe of Westport

Senator Will Haskell (Transportation Committee co-Chair)

Paul Young of JuiceBar




First Look at Managed Charging Incentives

Utility EV Rate Design – Proposed Details for Single Family Residences

The grid at the top of this post comes from a filing by Eversource for its proposed EV charging incentive structure for single family residential homes. It is one piece of the many-legged creature that is the new EV Rate Design Adjudication that was released by the Public Utilities Regulatory Authority (PURA). In turn, the EV Rate Design is but one facet of PURA’s larger grid modification docket. To be clear, these incentives come from the utilities.

When the adjudication was released in mid-July, not all of the incentive levels and implementation details had been determined. Working groups were set up to address the unfinished work. This is the month when a lot of the submissions are required.

The EV Rate Design is a big program that includes incentives for residential, commercial, workplace, fleet, and public charging. The incentives include hardware and installation subsidies, make ready, demand charge mitigation, and financial incentives to avoid charging during peak periods. The grid up above is only the single family residential part. This is not final. It has been submitted by Eversource to PURA for approval. There is a comment period and there could be changes. It is our expectation that changes will likely be at the margin. For that reason, we thought it worthwhile to tease it and these are the provisions.

Please note that this program begins in January 2022 and the subsidies for hardware and installation only apply to purchases after the start of the program. The first set of bullet points are for hardware and installation.

  • A household can receive a $500 subsidy to offset the purchase of a smart charger. It has to be a smart charger, meaning WiFi enabled, in order to be able to participate in the program because the utility, or Electric Distribution Company (EDC) as they are referred to, has to be able to see the charger/charging activity. Taking this subsidy requires participation in the demand response or managed charging program. $500 is a meaningful amount as there are smart chargers out there in the $6-700 range. Only approved equipment is eligible. The approval list has not yet been released. This is necessary because the EDC has to know that the unit will function in its particular software environment.
  • There is an additional $500 subsidy to offset the cost of bringing a 240 volt line from the panel to the garage. The total cost of this will vary with each residence based on the amperage of the line being pulled and the difficulty and distance in getting from the panel to the garage.
  • If your panel does not have enough capacity for an EV charger, or the charger you want, you would have to upgrade your electric service. There is no provision to offset that expense, which can be $5000 or more.
  • There is an installed base of dumb chargers among existing EV owners and the program has a provision for these folks to participate.
    • If the vehicle has telematics access, GM and Tesla being the specific examples cited in the filing, the utility can capture the data via the car without needing the smart charger.
    • If there is not telematics access, the utility will send a device to track it.
  • There may be an installed base of smart chargers. The filing doesn’t address this. It may be an omission. If the program wants to treat these differently than a dumb charger, then one would have to wait for a determination of whether this equipment is approved.

The next incentives are for participation. The idea is to offer discounts to get customers to charge their EVs during periods of lower electricity demand. This will help load balance the grid.

  • For those accepting the hardware and installation incentive, since that comes with the obligation to participate, there is no enrollment incentive.
  • For telematics participants, there is a $200 enrollment incentive. For non-telematics “device” participants, the enrollment incentive is $150.
  • Charging incentives for smart charger and non-smart charger participants are capped at $200 annually.
    • The program is intended to have 2 levels of participation: demand response and managed charging. Only demand response will be rolled out for 2022. Managed charging will follow 12 months later.

Demand response means that the utility will alert customers when a high demand period is coming. The alert will typically happen 24 hours prior to the event. These events will generally be 3 hour blocks of time occurring between 3 – 9PM in June through September on days when demand spikes. Customers with smart chargers will be opted-in by default but have the ability to opt-out for a given event in response to an alert. Being opted-in means that the car will either have its charging rate curtailed or will temporarily not be able to charge during the high-demand block of time. If a car is simply not plugged-in, that counts as being opted-in. Customers are permitted up to 2 opt-out events per month to remain eligible for the incentive. Telematics customers will work similarly, except it is up to the customer not to plug-in during these times (since the utility can’t control the charger). The incentive is structured as $50 per month for each of the 4 months, paid annually after the summer.

The minimum participation requirement is 24 months. After 24 months, participation continues unless affirmatively withdrawn by the customer. Participation may be terminated prior to 24 months if there are extenuating circumstances, such as customer no longer owning an EV or moving to a new residence.

The more advanced demand charge level allows the utility to throttle the rate of charge as needed. There are no discreet events as with demand response. Customers can switch between tiers in either direction, but must participate for 6 months before switching and then another 6 months before switching again. The EDCs have proposed that a higher incentive be made available to participants in the more advanced managed charging program but have not yet specified how much it will be.

As noted at the start of the post, this plan is not final. We will publish updates as events unfold.

 




Bolt Owners Still Treading Water

The Chevrolet Bolt recall is inching closer to the one year mark, having started in November of last year. GM expanded the scope of the vehicles being recalled over the course of several stages until in August, it expanded to every Bolt manufactured. That’s the bad news/good news. The recall involves every Bolt, but it hasn’t been a big seller. The irony is that was beginning to change. Since the introduction of the redesigned model this year which came with a lower price, it has been getting traction as one of the better BEV values. Below is the registration trend of the Bolt in CT, compared with its stablemate Volt that was discontinued in 2019. The most recent numbers in the chart are as of July 1, which was before deliveries began of the Bolt EUV.

Bolt Trend in CT

 

There may finally be a ray of hope. ElectricDrive.com reported that GM has identified the cause and that its supplier, LG Chem, has restarted production lines. New battery cells could be reaching dealers by later this month. It is not known how long it will take to work through the recall backlog as well as the resumption of new vehicle manufacturing. The automaker also announced “new diagnostic software” to be deployed over the next 60 days.

The recall does tell us a couple of things. If you read the ElectricDrive piece, the problem is described as a defect in the manufacturing process. There is more detail than that, but the point is that it isn’t a problem with the battery design or underlying technology. It is strictly quality control. In the article, it specifies that the problem occurred at the LG plant in Korea. But LG opened a plant in Michigan in 2019 and newer Bolts have batteries manufactured at that facility. The fact that GM included Bolts with batteries manufactured in each facility indicates a more across the board concern. (Batteries are very heavy and expensive to ship. It is much more cost-effective to co-locate battery and vehicle manufacturing. The Michigan facility is likely part of how GM was able to lower the price of the refreshed Bolt. Perhaps it provides some measure of hope that there will be a meaningful battery manufacturing presence in this country, a critical national security technology, as opposed to our usual practice of developing technology and then ceding the manufacturing to the Chinese, e.g. solar panels.)

There are a number of Bolt owners among club members. For a variable number of months now, depending upon which recall batch their vehicle is in, they have been living with a vehicle that needs to be garaged outdoors and used in a range-compromised fashion. The Bolt’s 259 mile range is now effectively 163 with the guidance to maintain a battery state of charge of not less than 70 miles and no more than 90%. With this slow-rolling, multi-stage recall, where there is still no definitive no end in sight, how proactively has GM or its Chevy dealers been  communicating with their customers? Bolt owners responded to our query between September 21st and October 4th.

GM has been in a difficult spot, given the expanding scope of the recall, the elusive nature of the cause, and possibly its negotiations to get LG to assume some portion of the liability. Nonetheless, GM and Chevy dealers are responsible to the customers and the general consensus is that there has been a minimal level of communication. The near-silence from GM may be be because it hasn’t had much to say, but there does not seem to be much of a communications strategy in place. The number of communications from GM seems to basically be one, or one per recall if the vehicle was in one of the earlier batches before the full scope of the problem became apparent. The content boils down to, “be patient.” Some owners are frustrated, while others have more equanimity, with GM getting points for proactively expanding the scope of the recall. The dealers don’t seem to be much in the loop. Updates have not been forthcoming as the saga has dragged on. No complimentary loaners have been provided.

Some customers have requested that GM repurchase their vehicle. One advised that there is a YouTube channel called “Wrenching Fool” that provides guidance on how to go about getting a case number. The repurchase requests are being evaluated by GM on a case by case basis and do not appear to have been resolved to this point.

There was one exception to that. Club-member Glen Zackowski reports reaching a favorable repurchase deal with his dealership, Grossman Chevrolet, in Old Saybrook. He will have to wait until the car is fixed. At that point, he will be the owner of a new Bolt EUV. No doubt, staying in the family helped. Customers also report that they like the car. They just wish this process had been made easier for them.

 

 

 

 




Westport Police Led The Way, And Will Be Again Next Week

Tesla Tech Enables Innovative Solutions to Law Enforcement Customization

The Westport Police were out in front of the market when they acquired a Model 3 for patrol car duty in December 2019.

What is becoming apparent is that their diligence and attention to detail placed them further ahead than others who made a similar move after they did.

Case in point – how does one handle the police electronics. In a conventional ICE police car, the vehicle is equipped with a heavy-duty alternator. The Tesla doesn’t have an alternator – what to do?

One option, as was done with a Model Y that went into service this past July in Eden Prairie, Minnesota, is to add a second 12-volt battery. Eden Prairie, MN, Model Y, battery in frunkThis photo was published in DriveElectricCanada.ca. It shows the additional battery parked tidily in the frunk.

While that works, a more elegant solution was arrived at in Westport, which was to wire the police electronics directly into the large battery. The police report this being a trivial drain. It required the police and Whelen Engineering working with Tesla to do some recoding to make it happen.

The point is that there is a lot there when it comes to the potential to re-purposing the native tech in a Tesla. Westport has also been able to incorporate some of the camera and computing power into the license plate reader.

We don’t know how widely this knowledge about these opportunities to lower the cost of customization is being disseminated, though the Westport Police have more than done their part in terms of being generous with their time and sharing what they have learned.

The police have the approval for another electric patrol car, which will most likely be the Model Y.

Model 3 to Lead EV Parade

Officer Charles Sampson, who was the project leader for the Tesla patrol car, will be driving the Model 3 as the escort for the EV parade on October 2nd. There will be an opportunity to check out the vehicle before the start of the parade. The parade departs from the Westport Train Station at 10 AM. Registration is still open at https://bit.ly/GreenWheels

Drivers should arrive between 9 and 9:30 to give us time to organize.